What Size Generator Does a Call Centre Need? | PAVO
A call centre sells nothing but answers, and every answer depends on a screen, a headset and a server staying on.
What size generator does a call centre need? A 50-seat centre typically needs a 40–60 kVA set, a 100-seat centre 60–100 kVA, and a 250-seat centre 150–250 kVA. The figure covers agent workstations, VoIP and servers, plus the air conditioning that keeps them running — and the UPS recharge load that most quotations forget.
- What a Call Centre Actually Needs Power For
- The Dropped-Call Window: What an Outage Actually Costs
- Sizing the Set: Three Centre Sizes
- VoIP, UPS and the Generator Handover
- Fuel, Noise and the Urban Problem
- Three Call Centres That Lost Power
- Frequently Asked Questions
- Specification Checklist
What a Call Centre Actually Needs Power For
A call centre’s electrical load looks small on paper and behaves differently from any other commercial load. There are no large motors, no furnaces, no production lines. The load is hundreds of small, identical loads — one per seat — plus a small number of critical loads that cannot tolerate a single second without power. That combination is what makes the sizing easy to get wrong in both directions: a set sized from the building’s total demand is far too large, and a set sized from the agent workstations alone is far too small.
The loads fall into three tiers. The first tier is the agent floor: workstations, headsets, phones and lighting. The second tier is the network core: VoIP servers, session border controllers, CRM and recording servers, core switches and the UPS that holds them. The third tier is the building: air conditioning, lifts, water pumps, fire systems and the common areas. A set that covers the first two tiers keeps the centre taking calls. A set that covers all three keeps the centre comfortable. The specification has to state which one the buyer is paying for, because the difference between them is roughly half the set size.
The Philippines shows the scale of the sector. The country’s IT and business process management industry employs about 1.7 million people and earns more than $35 billion a year in revenue, and its second-largest hub after Metro Manila is Cebu, with more than 150,000 BPO workers. A single floor in Cebu or Manila can hold 500 seats. When the grid fails there, the question is not whether the building has power — it is whether 500 agents can keep talking, and for how long.
The Agent Floor
One agent’s desk draws less power than a kettle. A thin client draws 25–40 W, two monitors draw 40–60 W between them, and the headset draws almost nothing. A desk phone on Power over Ethernet draws 5–10 W. The total per seat is 120–150 W at the desk, and a 100-seat floor draws 12–15 kW for workstations. Lighting adds 8–10 kW for a 1,000-square-metre floor of LED panels. The numbers are small, and that is the trap: a buyer who adds up the desks and stops there specifies a 25 kVA set for a 100-seat centre, and then discovers the rest of the building.
The floor’s load is also almost perfectly flat. Agents sit down at the same time, log in at the same time, and take calls at the same time. There is no diversity to apply and no off-peak to hide behind. A 250-seat floor draws its full workstation load from the first minute of the shift to the last, and the set has to carry it continuously, not in bursts. That flat profile is good news for the engine — a diesel set likes a steady load — but it means the sizing has no slack in it.
VoIP, Servers and the Network Core
The second tier is small, expensive and unforgiving. A 250-seat centre’s network core — VoIP servers, session border controller, CRM and recording servers, core switches, firewall and the PoE switches that power the phones — draws 10–15 kW. The UPS that protects it is usually 60 kVA for a centre of this size, and the UPS is the load that decides the generator’s behaviour in the first minute of an outage.
Two details matter here. The first is call recording. Many clients — banks, insurers, utilities — require every call to be recorded, and the recording is a compliance record, not a nice extra. A power cut in the middle of a call loses the recording and the proof that the call happened. The recording servers and their storage therefore sit on the UPS, and they sit on the generator’s essential bus, because a lost recording is a contract breach.
The second detail is the PoE budget. Each phone port on a switch can draw up to 15.4 W under the 802.3af standard, and a 48-port PoE switch can draw 740 W from its own supply when every port is loaded. A centre with 250 phones needs six such switches, and their combined draw — about 4.5 kW — is a load that appears on the generator the moment the phones come back. It is small, but it is the load that keeps the agents talking, and it is the load most quotations leave out.
Air Conditioning: The Load Nobody Counts
Air conditioning is the largest single load in a call centre, and the one most often forgotten. A 250-seat floor generates about 62 kW of heat from people and equipment alone — roughly 100–120 W of sensible heat per person plus 130 W per workstation — and the cooling plant that removes it draws 60–80 kW of electrical power. That is 40–50% of the centre’s total load, and it is the load that decides whether a 150 kVA set is enough or whether the answer is 250 kVA.
The cooling load is also the load with the worst starting transient. A VRF outdoor unit’s compressor starts direct-on-line or with a soft starter, and its motor starting current is five to seven times its running current. Three 25 kW outdoor units starting together can demand 300 kVA of starting apparent power for a second — more than the whole set’s rating. The compressors must therefore start one at a time, in sequence, and the set must be sized for the largest single start, not for the running load.
There is a temptation to drop the air conditioning from the generator load and let the floor warm up. It does not work. A 250-seat floor with its cooling off gains heat at 62 kW, and within an hour the floor is above 30°C. Agents cannot work in that heat, headsets slip, screens glare, and the centre’s own health and safety rules close the floor. A centre that drops its cooling has bought a generator that keeps the servers alive while the agents go home. The cooling stays on the essential bus, at least at reduced capacity, and the set is sized for it.

The Dropped-Call Window: What an Outage Actually Costs
A call centre measures an outage in calls, not in kilowatt-hours. The grid fails, the automatic transfer switch moves the essential bus to the generator, and if everything works, the agents notice nothing more than a flicker. If anything in that chain fails, the centre loses its calls in seconds, and the cost of those calls is measured in service credits, abandoned callers and lost clients. The arithmetic is worth doing before the outage, because it is the arithmetic that justifies the generator.
The SLA Arithmetic
Most outsourced call centres work to a service level agreement, and the most common is the 80/20 standard: 80% of calls answered within 20 seconds. The abandonment target is usually under 5%, and often under 3%. Breach the standard and the contract pays service credits — commonly 5–10% of the monthly invoice for the month in which the breach occurred, and more for a repeated breach.
Take a 250-seat centre billing $400,000 a month. One month with a breached SLA costs $20,000–40,000 in credits. A four-hour outage in a busy week can breach the month’s service level on its own, because the calls that arrived during the outage did not just wait — they abandoned, and the callers who abandoned either called back and queued again, or called a competitor. The generator that prevents that month’s breach pays for a large part of itself in a single afternoon.
The penalty is not only financial. A client that audits a breach asks what happened, and the answer “the power went out” is not an excuse — it is an admission that the centre had no backup power, or that its backup power did not work. The client’s next question is whether to renew the contract. In the Philippines BPO sector, where a single client can account for 30–40% of a centre’s seats, losing one client closes a floor.
The 10-Second Gap
The gap between grid failure and generator power is the most dangerous ten seconds in a call centre’s day. The automatic transfer switch detects the failure, signals the set to start, waits for voltage and frequency to stabilise, and then transfers the load. Under NFPA 110, a Type 10 emergency power supply system must accept its load within 10 seconds. That is the standard for life safety, and a call centre is not life safety — but the centre’s UPS holds the network core for only 10–15 minutes, and the generator has to be on load well inside that window, or the UPS drains and the calls drop anyway.
The sequence fails more often than buyers expect. The set starts but the transfer switch does not transfer, because the voltage is out of range. The set transfers but the UPS refuses the generator’s power, because the frequency is drifting. The set takes the load but the air conditioning compressors start together and the voltage dips, and the UPS drops back to battery. Each failure has the same result: the agents’ screens go dark, the phones go dead, and the queue empties in seconds. The monthly loaded test exists to catch exactly these failures, and a centre that tests its set only on no-load has not tested it at all.
The Agent-Idle Cost
The cost that never appears in the generator quotation is the cost of the agents themselves. A 250-seat centre in Manila pays its agents roughly $6–9 an hour, fully loaded. Two hundred and fifty agents sitting idle cost $1,500–2,250 an hour in wages alone. A four-hour outage costs $6,000–9,000 in wages for work that never happened, and that is before the service credits, before the callbacks, and before the overtime needed to clear the backlog.
The backlog is the part buyers forget. Every call that dropped during the outage generates a callback, so the queue after restoration is longer than the queue before the outage. A centre that loses four hours of calls needs six or eight hours of overtime to clear them, and the overtime is paid at a premium. The recovery hump is the reason an outage that lasts four hours costs the centre a full day’s productivity, not four hours of it.
Sizing the Set: Three Centre Sizes
Sizing a diesel generator for a call centre starts with the load list, not with the building’s total demand. The generator sizing guide gives the general method: list every load, apply the diversity that actually applies, convert kilowatts to kilovolt-amperes at a power factor of 0.8, add the starting transient of the largest motor, and add a margin for growth. The bands below apply that method to four classes of call centre. They are typical, not universal — the load list of the actual centre is the authority — but they give a buyer a figure to test a quotation against.
| Centre size | Seats | Agent + IT load | HVAC load | Total running load | Diesel set |
|---|---|---|---|---|---|
| Small in-house centre | 25–50 | 8–12 kW | 8–12 kW | 15–25 kW | 40–60 kVA |
| Mid-size BPO floor | 100 | 15–20 kW | 20–30 kW | 40–55 kW | 60–100 kVA |
| Large BPO floor | 250 | 35–50 kW | 60–80 kW | 100–140 kW | 150–250 kVA |
| Campus, multi-floor | 500+ | 70–100 kW | 120–160 kW | 200–280 kW | 300–500 kVA, N+1 |
A small in-house centre of 25–50 seats — a utility’s own customer service team, a bank’s collections desk — carries 15–25 kW of running load and needs a 40–60 kVA set. A mid-size BPO floor of 100 seats carries 40–55 kW and needs 60–100 kVA. A large floor of 250 seats carries 100–140 kW and needs 150–250 kVA. A campus of 500 seats or more carries 200–280 kW and needs 300–500 kVA, and at that scale the answer is usually two sets in N+1, so that one set can be out for service and the centre still has its full capacity.
The Worked Example: A 250-Seat Centre in Manila
The clearest way to test a quotation is to work one centre through, load by load. The centre is a 250-seat BPO floor in Quezon City, Manila, on the 12th floor of an office tower, operating 24 hours a day in three shifts for a US telecoms client. The load list is the whole sizing argument in one table.
| Load | Calculation | Running load |
|---|---|---|
| 250 workstations | 250 × 130 W | 32.5 kW |
| VoIP phones and PoE switches | 250 × 8 W + 6 switches | 5.0 kW |
| Servers, storage, network core | 10–15 kW | 12.0 kW |
| UPS losses and battery recharge | 20% of UPS load | 8.0 kW |
| Lighting and emergency lighting | 1,000 m² at 8 W/m² | 6.0 kW |
| HVAC, VRF cooling | 3 × 25 kW outdoor units | 75.0 kW |
| Lifts, water pumps, fire panel (allocated share) | Building share | 10.0 kW |
| Total running load | 148.5 kW |
The total is 148.5 kW. At a power factor of 0.8 that is 186 kVA, and with a 20% margin for growth and for the hottest day of the year it is 223 kVA. The next standard set size is 250 kVA, and that is the set the centre buys — a Cummins C250D5 or its equivalent, in a silent canopy, with a 3,000-litre day tank. The alternative is two 150 kVA sets in N+1, which costs more but lets one set be serviced without taking the centre’s backup away, and lets the centre run a single set at night when only 80 seats are staffed.
The same centre’s night shift shows why the margin matters. At 2 am only 80 of the 250 seats are staffed, the workstation load falls to 10 kW, and the total load drops to about 100 kW — roughly 40% of the set’s rating. A diesel set running at 40% load for hours is at risk of wet stacking, where unburnt fuel and carbon build up in the exhaust because the engine never reaches its working temperature. The monthly loaded test and the occasional full-load run exist to burn that carbon out, and the set’s maintenance schedule should include a load-bank test at least once a year to prove it can still carry its full rating.
The UPS Recharge Trap
The load that most quotations forget is the UPS recharge load. When the grid fails, the UPS carries the network core on its batteries for the 10 seconds it takes the generator to start, and it discharges by perhaps 5–10% of its capacity. When the generator takes over, the UPS recharges its batteries — and that recharge draws 20–25% of the UPS rating for the first hour, on top of the load the UPS is already carrying.
For the Manila centre, the UPS is 60 kVA and the recharge load is about 8 kW, which is already in the load list above. But a centre that sizes its generator from the running load alone, without the recharge load, specifies a set that is 8 kW short — and that shortfall appears in the first minute of the outage, when the generator is also absorbing the starting transient of the first air conditioning compressor. The set dips its voltage, the UPS sees the dip and drops back to battery, and the centre is back where it started.
The rule that generator suppliers use is to size the set at 1.5–2 times the UPS rating, depending on the rectifier type and the battery recharge rate. A 60 kVA UPS needs a set of at least 90–120 kVA on the UPS load alone, before the workstations and the air conditioning are added. That ratio is the reason a 100-seat centre with a 60 kVA UPS ends up with a 100 kVA set rather than a 60 kVA one, and it is the reason the UPS and the generator have to be specified together, by one supplier, against one load list.
The rating matters as much as the size. A centre that runs its set only during outages and tests — a few hundred hours a year — buys a standby-rated set. A centre in a market with daily load shedding, where the set runs four or six hours every day, needs a prime-rated set, because a standby-rated set run for 2,000 hours a year voids its warranty and wears out in two or three years. The standby and prime ratings article explains the difference in full, and the Cape Town case in the next sections shows what happens when the wrong rating is bought.

VoIP, UPS and the Generator Handover
The handover from UPS to generator is the moment a call centre’s backup power either works or fails, and it fails more often than any other part of the system. The UPS and the generator are two machines that were usually bought from two different suppliers, installed by two different contractors, and tested separately. The first time they meet is during a real outage, and that is the worst time to discover that they disagree.
Why the UPS Refuses the Generator
A UPS refuses generator power for two reasons, and both are about power quality. The first is frequency. A generator’s frequency drifts when a load is applied suddenly: the engine slows, the governor opens the fuel rack, and the frequency recovers over a second or two. A line-interactive UPS watches that frequency, and if it moves outside its window — typically ±3 Hz, and tighter on some models — the UPS decides the generator’s power is not mains power and stays on battery. The battery drains, the UPS shuts down, and the network core goes dark while the generator runs perfectly well a floor below.
The second reason is harmonics. A UPS rectifier is a non-linear load: it draws current in pulses rather than in a smooth sine wave, and those pulses distort the generator’s voltage waveform. If the total harmonic distortion rises above about 5%, the UPS again refuses the supply. The distortion is worse when the alternator is small relative to the UPS, because a small alternator has a higher subtransient reactance and distorts more easily under a harmonic load. That is another reason the set is sized at 1.5–2 times the UPS rating, and another reason the alternator is sometimes oversized by one frame for the same engine.
The fix is not complicated, but it has to be specified before the order is placed. An online double-conversion UPS tolerates a wider frequency and voltage window than a line-interactive one, and it is the right choice behind a generator. A 12-pulse rectifier or an active harmonic filter on the UPS reduces the distortion the generator sees. And the generator’s own governor should be electronic, not mechanical, because an electronic governor holds frequency within ±0.5% under a step load where a mechanical governor can swing ±2%. The UPS compatibility problem is a specification problem, and it is solved in the quotation, not in the outage.
Staged Loading: The Sequence That Works
A call centre’s load should never be applied to the generator all at once. The correct sequence takes about three minutes, and it is written into the automatic transfer switch’s controller so that it happens the same way every time, without anyone having to remember it.
First, the UPS and the network core transfer — the servers, the switches, the recording system. That load is 15–20 kW and it is electronic, so it applies without a starting transient. Second, the agent floor transfers in two halves, 125 seats at a time, 30 seconds apart, so the workstation load ramps rather than steps. Third, the air conditioning compressors start one at a time, 30 seconds apart, so that no two motor starting transients overlap. The lifts and the water pumps transfer last, or not at all, because the centre can operate without them for a few hours.
The sequence is tested every month, under load, for at least 30 minutes at 30% of the set’s nameplate rating, as NFPA 110 requires. The test record should show the voltage and frequency at each step, and the time from grid failure to full load. A centre whose test record shows the set starting but never shows it carrying the air conditioning compressors has not tested the sequence that matters. A data centre tests the same way, and for the same reason: the test is the only proof the system works, and the proof has to exist before the outage, not after it.
Fuel, Noise and the Urban Problem
A call centre’s generator lives in a city, and a city imposes three constraints that a factory site does not: the fuel has to arrive through traffic, the noise has to stay below the level the neighbours will tolerate, and the set has to fit into a building that was designed for offices, not for engines. Each constraint is manageable, and each one is expensive to fix after the set is installed.
Fuel Autonomy: 72 Hours in a City Building
A call centre’s diesel set should be fuelled for 72 hours of continuous operation at the expected load, and the tank should be sized for the load the set will actually carry, not its nameplate rating. The arithmetic uses the set’s fuel consumption at the load factor it will run at, and the numbers are smaller than a factory’s but no less decisive.
A Cummins C200D5 — 200 kVA standby / 182 kVA prime — burns 48.9 litres per hour at full prime load, 36.7 L/h at 75% load, 24.5 L/h at 50% load and 12.7 L/h at 25% load. The Manila centre’s 250 kVA set, running at about 60% load, burns roughly 45 litres per hour. Seventy-two hours at that rate needs 3,240 litres, and a 3,000-litre day tank with a bulk tank beside it is the standard answer. A larger set burns more: a Cummins C500D5 at 75% load burns 69.9 L/h, and 72 hours needs 5,033 litres.
The tank is the easy part. The hard part is getting the fuel to it. A call centre in a city tower has its generator on the roof or in the basement, and the fuel tanker has to reach it through streets that are congested on a normal day and gridlocked on the day of a major outage, when every other building in the district is refuelling its own generator at the same time. The fuel contract should name the supplier, the delivery window and the priority, and the tank should be full before the storm season, not during it. The Cebu case below shows what happens when the fuel runs out and the roads are blocked.
Fuel that sits for a year between outages also goes bad. Diesel absorbs water from condensation, and the water breeds the microbes that block filters and corrode injectors. The fuel should be tested and polished on a schedule, and the tank should be sized so that the fuel turns over — used in tests and topped up — rather than sitting for years. A 3,000-litre tank that has sat for two years without testing is not 3,000 litres of usable fuel.
Noise and Neighbours
A silent canopy generator is rated at 65–75 dB(A) at 7 metres, which is roughly the level of a busy street. That is acceptable in an industrial estate and unacceptable outside a bedroom window. Most cities limit night-time noise at the residential boundary to 45–55 dB(A), and a call centre in a mixed-use district has to meet that limit while running its generator at 2 am.
The attenuation is straightforward but it costs money and space. An acoustic louvre on the air intake, a residential-grade exhaust silencer, and a masonry enclosure around the set can bring the level at the boundary down by 15–20 dB(A). Distance helps more than anything: every doubling of distance drops the level by 6 dB(A), so a set 28 metres from the boundary is 12 dB(A) quieter there than a set 7 metres away. The placement decision and the noise decision are the same decision, and they have to be made together, before the set is ordered.
The noise limit also applies inside the building. A set in a basement plant room transmits its vibration through the structure, and the agents on the floor above hear it as a low hum through their headsets. Anti-vibration mounts, a floating plinth and flexible exhaust and fuel connections are part of the installation, not extras, and a centre that skips them discovers the hum on the first monthly test.
Placement: Roof, Basement or Street?
A call centre’s generator has three possible homes, and each has a drawback. The basement is the most common and the worst: it is the first place to flood, it needs forced ventilation for both combustion air and radiator heat, and its exhaust has to run up the full height of the building. A set in a basement that floods is the first thing to fail, and it fails precisely when the building needs it — during the storm that took the grid down.
The roof is the cleanest for ventilation and exhaust, and the noisiest for the neighbours below, but it needs a structural check. A 200 kVA silent set weighs about 2,000–2,500 kg, and a 500 kVA set weighs 4,000–5,000 kg, and the roof has to carry that weight plus the fuel tank, plus the crane that lifts them there. The crane lift alone can cost more than the set’s transport, and it has to be booked months ahead in a busy city.
The ground-level compound — a fenced enclosure beside the building, with the set on a concrete plinth and the fuel tank bunded beside it — is the usual answer, and it is the one the featured image shows. It is accessible for fuel delivery and for service, it is above the flood line if the plinth is high enough, and it is far enough from the bedrooms to meet the noise limit. Its drawback is security: a generator in a street-level compound in Manila or Johannesburg needs a fence, a lock and a camera, because a diesel set and a full fuel tank are worth stealing. Continuous remote monitoring of the set — fuel level, running hours, alarms — is part of the answer, because a set that is stolen or drained is a set that is not there when the grid fails.
Three Call Centres That Lost Power
Three outages, in three countries, show the same lesson from three directions. In Cebu the generator worked and the fuel ran out. In Cape Town the generator worked and the rating was wrong. In Texas there was no generator at all, and the work-from-home plan failed with it.
Cebu, December 2021: Typhoon Odette
Typhoon Odette — known internationally as Rai — made landfall on 16 December 2021 as a Category 5-equivalent storm, with sustained winds of about 195 km/h. It crossed Siargao and Dinagat, then struck Cebu, the Philippines’ second-largest BPO hub. Power lines came down across the island, and large parts of Cebu City and the surrounding municipalities lost grid power for days. Some areas waited more than two weeks for restoration.
The BPO centres that had generators kept working. The centres that had fuel kept working for longer. The centres that had neither closed, and their agents — many of them working from home by then, in houses that had also lost power — could not work at all. The industry association, IBPAP, coordinated between member companies, and some firms moved agents to Manila, where the grid was intact, or to hotels with their own generators. The centres that stayed open ran their sets for days, not hours, and the fuel that had been sized for a 72-hour outage ran out on the third or fourth day, because the roads were blocked by fallen trees and power lines and the tankers could not get through.
The lesson is about fuel, not about generators. A set that runs for 72 hours is no use in an outage that lasts two weeks, and a fuel contract that assumes the tanker can reach the site assumes the roads are open. The centres that fared best were the ones with the largest tanks and the earliest refuelling — the ones that treated fuel autonomy as a two-week problem, not a three-day one.
Cape Town: Load Shedding as a Daily Event
South Africa’s load shedding is the opposite problem: not a single disaster, but a daily event. In 2022 and 2023, Eskom’s load shedding reached Stage 6, which cut power for up to 10–12 hours a day in the worst weeks. The Western Cape’s BPO sector — about 70,000 jobs in and around Cape Town, serving clients in the UK, the US and Australia — could not close for half of every working day, so it ran on diesel.
A generator that runs four to six hours a day, five days a week, is not a standby machine. It is a prime-power machine, and it has to be bought, rated and maintained as one. Centres that had bought standby-rated sets discovered that their warranty did not cover the hours they were running, that their service intervals came around every few weeks instead of every few months, and that their engines wore out in two or three years instead of ten. The fuel cost became a line in the operating budget rather than a contingency: diesel at the pump costs several times more per kilowatt-hour than grid power, and a centre running a 250 kVA set for six hours a day burns about 270 litres a day — roughly $300 a day at South African pump prices, or $6,000–7,000 a month.
Some centres adapted by shifting their night shifts to match the load-shedding schedule, so that the generator ran during the hours when the grid was down and the grid carried the centre when it was up. Others installed solar panels to cut the generator’s hours. The lesson is the same either way: when the grid fails every day, the generator is not a backup. It is the power supply, and it has to be specified as one.
Texas, February 2021: Winter Storm Uri
Winter Storm Uri reached Texas on 14 February 2021, and the state’s grid failed on a scale nobody had planned for. At the peak, about 4.5 million customers were without power, and many stayed without power for days, in freezing temperatures, with burst pipes and no heating. Call centres in Austin and Dallas closed. Their agents could not work from home, because their homes had no power either.
The Texas case is the one that breaks the work-from-home assumption. A centre that had moved its agents home during the pandemic assumed that its business continuity plan was distributed — that no single outage could take out the whole workforce. Uri took out the whole workforce, because the outage covered the whole city, and the agents’ homes were in the same grid as the office. The centre’s generator, if it had one, protected the office floor, but the agents were not on the floor. They were at home, in the dark, with dead phones and dead laptops.
The lesson is that a generator protects a place, not a workforce. A centre whose agents work from home needs a plan for the day the agents’ homes lose power — a plan that may mean bringing agents back to the generator-backed office, or moving the work to another city, or accepting that the centre will be dark for the duration. The generator is necessary, but it is not sufficient, and a business continuity plan that does not say what happens to the home workers is not a plan.
Frequently Asked Questions
What size generator does a call centre need?
A 50-seat centre typically needs a 40–60 kVA set, a 100-seat centre 60–100 kVA, and a 250-seat centre 150–250 kVA. The figure comes from the load list — workstations, VoIP and servers, UPS recharge and air conditioning — divided by a power factor of 0.8 and given a 20% margin, not from a rule of thumb.
Do call centres need a backup generator?
Yes. A call centre’s product is answered calls, and a grid failure drops every call in progress and stops new calls from arriving. Without a generator, the centre breaches its service level agreement within the hour, pays service credits of 5–10% of its monthly invoice, and risks losing the client. A UPS alone buys 10–15 minutes, which is not enough.
How long can a call centre run on a generator?
A call centre can run on a diesel generator for as long as the fuel lasts — typically 72 hours on the installed tank, and two weeks or more with a bulk tank and a refuelling plan. The limit is fuel, not the engine: a 250 kVA set at 60% load burns about 45 litres per hour, so 72 hours needs roughly 3,240 litres.
What happens to a call centre during a power outage?
The automatic transfer switch starts the generator and transfers the essential bus within 10 seconds, and the UPS carries the network core through the gap. If the generator starts and the load transfers in stages, the agents notice nothing more than a flicker. If the generator fails to start, or the UPS refuses its power, every call drops at once and the centre stays dark until the grid returns.
Can a diesel generator power a call centre?
Yes. A diesel generator can power a whole call centre — agent workstations, VoIP and servers, UPS recharge and air conditioning — provided the set is sized from the load list and the load is transferred in stages. A 250-seat centre needs a 250 kVA set, or two 150 kVA sets in N+1. The set cannot power the whole office tower, and it should not be asked to: lifts and non-essential floors are shed first.
Specification Checklist
1. What is the load list, seat by seat? Demand the list: workstations, VoIP phones and PoE switches, servers and network core, UPS recharge, lighting, air conditioning, and the building’s allocated share. Size the set from the list, not from a rule of thumb, and check the list against the worked example of a 250-seat centre at 148.5 kW.
2. Is the set sized for the UPS recharge load? Ask for the UPS rating and the recharge load, and check that the set is at least 1.5–2 times the UPS rating. A set that is sized only for the running load will dip its voltage in the first minute of the outage, when the UPS is recharging and the first compressor is starting.
3. Does the set start and accept load inside the UPS window? Ask for the test record: time from grid failure to full load, voltage and frequency at each step of the staged transfer, and the UPS battery state at the end of the test. If the set cannot take the full load inside the UPS’s 10–15 minute window, the system does not work.
4. Is the rating standby or prime — and does the duty match? Confirm the rating in standby and prime ratings terms, and confirm the expected annual hours. A standby-rated set is right for a centre that runs it only in outages; a centre with daily load shedding needs a prime-rated set, or the warranty will not survive the first year.
5. Is the fuel enough for 72 hours, and can a tanker reach the site? Check the tank capacity against the set’s consumption at the expected load factor, and check the fuel delivery contract. A 3,000-litre tank that a tanker cannot reach during a storm is not 3,000 litres of usable fuel.
6. Is the noise compliant at the boundary, day and night? Ask for the noise level at the property boundary with the set at full load, and compare it with the local night-time limit. If the set is on a roof, ask for the structural calculation as well — a 250 kVA set weighs more than 2,000 kg.
7. Has the set been tested under load, with the full staged sequence, this month? Ask for the monthly test record, showing the set carrying the workstations, the UPS and the air conditioning compressors in sequence. A test that runs the set on no-load proves only that the engine starts. The test that matters is the one that proves the centre keeps taking calls.
A call centre that drops its queue in an outage loses the calls, the service credits and the client. Size the set from the seat count, test it under load every month, and fuel it before the storm. For a load assessment and a quotation for a standby or prime-rated set, in open, silent or containerised configuration from 9 to 3750 kVA, contact PAVO.